The structured list of components and sub-assemblies needed to manufacture a final product is represented by the:

This question was previously asked in
RRB JE ME 22 Apr 2025 Shift 1 CBT 2 Official Paper
View all RRB JE Papers >
  1. lead time
  2. master file
  3. bill of materials
  4. components directory

Answer (Detailed Solution Below)

Option 3 : bill of materials
Free
General Science for All Railway Exams Mock Test
2.1 Lakh Users
20 Questions 20 Marks 15 Mins

Detailed Solution

Download Solution PDF

Explanation:

Bill of Materials (BOM)

Definition: A Bill of Materials (BOM) is a comprehensive list of raw materials, components, and sub-assemblies required to manufacture a final product. It includes details such as part numbers, descriptions, quantities, and the hierarchical structure of the product. The BOM serves as a blueprint for the manufacturing process, ensuring that all necessary materials and components are available and accounted for.

Purpose: The primary purpose of a BOM is to provide a clear and organized structure of all the components needed to build a product. It helps in planning, purchasing, inventory management, and production scheduling. A well-structured BOM ensures that the manufacturing process runs smoothly and efficiently, reducing the risk of errors and delays.

Types of BOM:

  • Engineering BOM (EBOM): Created by the engineering team, it includes technical specifications and design details of the product. It is used during the design and development phase.
  • Manufacturing BOM (MBOM): Used by the manufacturing team, it includes information needed for production, such as assembly instructions, tooling, and packaging details.
  • Sales BOM (SBOM): Used by the sales team, it includes items sold as part of a product bundle or kit. It helps in managing sales orders and customer requirements.

Components of a BOM:

  • Part Number: A unique identifier assigned to each component or material.
  • Description: A detailed description of the component or material.
  • Quantity: The number of units required for each component or material.
  • Unit of Measure: The standard unit used to measure the quantity (e.g., pieces, kilograms).
  • Hierarchy: The relationship between components and sub-assemblies, indicating how they fit together to form the final product.

Benefits of Using a BOM:

  • Ensures accurate and efficient production planning and scheduling.
  • Facilitates inventory management by providing a clear picture of required materials.
  • Helps in cost estimation and budgeting by listing all components and materials.
  • Improves communication and collaboration between different teams (engineering, manufacturing, sales).
  • Reduces the risk of errors and rework by providing a detailed and organized structure.

Analysis of Other Options:

1. Lead Time: Lead time refers to the amount of time required to complete a process or deliver a product, from start to finish. In manufacturing, it includes the time taken to procure materials, produce components, and assemble the final product. While lead time is a critical factor in production planning and scheduling, it does not represent the structured list of components and sub-assemblies needed to manufacture a final product.

2. Master File: A master file is a comprehensive database or record that contains all relevant information about a particular subject, such as customer data, inventory records, or employee details. In the context of manufacturing, a master file might include information about products, materials, suppliers, and production processes. However, it is not specifically focused on listing the components and sub-assemblies required to manufacture a final product.

4. Components Directory: A components directory is a catalog or list of all the parts and materials used in manufacturing. It provides detailed information about each component, such as part numbers, descriptions, and specifications. While a components directory is useful for managing and organizing components, it does not provide the hierarchical structure and relationships between components and sub-assemblies needed to manufacture a final product, as a BOM does.

Latest RRB JE Updates

Last updated on Jun 7, 2025

-> RRB JE CBT 2 answer key 2025 for June 4 exam has been released at the official website.

-> Check Your Marks via RRB JE CBT 2 Rank Calculator 2025

-> RRB JE CBT 2 admit card 2025 has been released. 

-> RRB JE CBT 2 city intimation slip 2025 for June 4 exam has been released at the official website.

-> RRB JE CBT 2 Cancelled Shift Exam 2025 will be conducted on June 4, 2025 in offline mode. 

-> RRB JE CBT 2 Exam Analysis 2025 is Out, Candidates analysis their exam according to Shift 1 and 2 Questions and Answers.

-> The RRB JE Notification 2024 was released for 7951 vacancies for various posts of Junior Engineer, Depot Material Superintendent, Chemical & Metallurgical Assistant, Chemical Supervisor (Research) and Metallurgical Supervisor (Research). 

-> The selection process includes CBT 1, CBT 2, and Document Verification & Medical Test.

-> The candidates who will be selected will get an approximate salary range between Rs. 13,500 to Rs. 38,425.

-> Attempt RRB JE Free Current Affairs Mock Test here

-> Enhance your preparation with the RRB JE Previous Year Papers