Download Solution PDFThe consumption rate of a material of a firm is 20 units per week and lead time of supply of the raw material is two weeks. Which of the following will be the reorder point?
Answer (Detailed Solution Below)
Detailed Solution
Download Solution PDFConcept:
The reorder point is the inventory level at which a new order is placed. The order must be placed while there is enough stock in place to cover demand during lead time.
The inventory level might be depleted at a slower or faster rate during lead time. When demand is uncertain, safety stock is added as a hedge against stock-out.
Re-order level is a level of material at which the storekeeper should initiate the purchase requisition for fresh supplies.
The re-order level is calculated as follows:
Re-order Level = Minimum Level (Safety stock) + (Average lead time x Average consumption)
Re-order Level =Consumption rate x Lead time
Calculation:
Given, Consumption rate = 20 units per week and Lead time = two weeks
\(\therefore\) Re-order Level = \(20\times2=40\ units\)
Last updated on May 19, 2025
-> JKSSB Junior Engineer recruitment exam date 2025 for Civil and Electrical Engineering has been released on its official website.
-> JKSSB JE exam will be conducted on 10th August (Civil), and on 27th July 2025 (Electrical).
-> JKSSB JE recruitment 2025 notification has been released for Civil Engineering.
-> A total of 508 vacancies has been announced for JKSSB JE Civil Engineering recruitment 2025.
-> JKSSB JE Online Application form will be activated from18th May 2025 to 16th June 2025
-> Candidates who are preparing for JKSSB JE can download syllabus PDF from official website of JKSSB.
-> The candidates can check the JKSSB JE Previous Year Papers to understand the difficulty level of the exam.
-> Candidates also attempt the JKSSB JE Mock Test which gives you an experience of the actual exam.