Download Solution PDFWhich of the following statements is/are correct?
Statement 1: A single large generating unit requires periodic maintenance, which may lead to a complete shutdown of power supply.
Statement 2: In a multi-unit system, maintenance can be scheduled without completely interrupting power generation.
Answer (Detailed Solution Below)
Detailed Solution
Download Solution PDFExplanation:
Power Generation Systems: Single Large Generating Unit vs Multi-Unit System
Definition: The operation and maintenance of power generation systems depend significantly on the configuration of the generating units. A single large generating unit and a multi-unit system are two different approaches to power generation, each with its own advantages and challenges.
Statement 1: "A single large generating unit requires periodic maintenance, which may lead to a complete shutdown of power supply."
Statement 2: "In a multi-unit system, maintenance can be scheduled without completely interrupting power generation."
The correct answer is:
Option 4: Both Statement 1 and Statement 2
Let us analyze each statement in detail:
Explanation of Statement 1:
In a power generation system with a single large generating unit, the entirety of the power supply is dependent on one unit. Such a system has the following characteristics:
- Dependency on a Single Unit: If the single generating unit requires maintenance or faces a technical issue, the entire power generation system may need to be shut down.
- Periodic Maintenance: All power generating units, including large ones, require periodic maintenance to ensure efficient operation and to prevent unexpected failures.
- Complete Shutdown Risk: Since there is no redundancy in a single-unit system, maintenance or unexpected downtimes may lead to a total interruption of the power supply. This is a significant drawback, particularly for critical infrastructure and industries that rely on an uninterrupted power supply.
Thus, Statement 1 is correct as it highlights the limitation of relying on a single large generating unit.
Explanation of Statement 2:
A multi-unit power generation system consists of multiple smaller generating units operating in parallel. This configuration offers several benefits:
- Redundancy: Since multiple units contribute to the total power generation, the system can continue to operate even if one unit is shut down for maintenance or experiences a failure. This ensures a continuous power supply.
- Scheduled Maintenance: Maintenance activities can be planned in such a way that they are performed on individual units sequentially, without requiring a complete system shutdown. This minimizes disruptions to power generation.
- Flexibility in Operation: Multi-unit systems allow for better load management. Units can be brought online or taken offline depending on the demand, optimizing fuel consumption and operational efficiency.
Therefore, Statement 2 is also correct as it accurately describes the advantages of a multi-unit system in terms of maintenance and uninterrupted power generation.
Conclusion:
Both statements accurately represent the characteristics of single large generating units and multi-unit systems. Hence, the correct answer is Option 4: Both Statement 1 and Statement 2.
Important Information:
To further understand the analysis, let’s evaluate why the other options are incorrect:
Option 1: Only Statement 1
This option is incorrect because it ignores the accuracy of Statement 2. While Statement 1 is correct, it does not provide a complete understanding of the topic as Statement 2 is also valid and relevant.
Option 2: Only Statement 2
This option is incorrect because it dismisses the validity of Statement 1. Statement 1 correctly describes the challenges associated with single large generating units, which is a critical aspect of the discussion.
Option 3: Neither Statement 1 nor Statement 2
This option is incorrect because both statements are correct. Statement 1 accurately highlights the limitations of single-unit systems, while Statement 2 effectively explains the advantages of multi-unit systems.
Conclusion:
The distinction between single large generating units and multi-unit systems is crucial in power generation. Single-unit systems are simpler in design but face significant challenges in terms of reliability and maintenance. On the other hand, multi-unit systems offer greater flexibility, redundancy, and reliability, making them more suitable for applications requiring uninterrupted power supply.
Last updated on Jul 2, 2025
-> The RRB JE CBT 2 Result 2025 has been released for 9 RRBs Zones (Ahmedabad, Bengaluru, Jammu-Srinagar, Kolkata, Malda, Mumbai, Ranchi, Secunderabad, and Thiruvananthapuram).
-> RRB JE CBT 2 Scorecard 2025 has been released along with cut off Marks.
-> RRB JE CBT 2 answer key 2025 for June 4 exam has been released at the official website.
-> Check Your Marks via RRB JE CBT 2 Rank Calculator 2025
-> RRB JE CBT 2 admit card 2025 has been released.
-> RRB JE CBT 2 city intimation slip 2025 for June 4 exam has been released at the official website.
-> RRB JE CBT 2 Cancelled Shift Exam 2025 will be conducted on June 4, 2025 in offline mode.
-> RRB JE CBT 2 Exam Analysis 2025 is Out, Candidates analysis their exam according to Shift 1 and 2 Questions and Answers.
-> The RRB JE Notification 2024 was released for 7951 vacancies for various posts of Junior Engineer, Depot Material Superintendent, Chemical & Metallurgical Assistant, Chemical Supervisor (Research) and Metallurgical Supervisor (Research).
-> The selection process includes CBT 1, CBT 2, and Document Verification & Medical Test.
-> The candidates who will be selected will get an approximate salary range between Rs. 13,500 to Rs. 38,425.
-> Attempt RRB JE Free Current Affairs Mock Test here
-> Enhance your preparation with the RRB JE Previous Year Papers.