Download Solution PDFWhich of the following is a power plant with high initial cost, low running and maintenance cost and with NO standby losses?
Answer (Detailed Solution Below)
Detailed Solution
Download Solution PDFThe hydroelectric power plant has a high initial cost because of the construction of the dam.
Hence, the correct answer is option 3.
Comparison between different power plants:
Last updated on Jul 18, 2025
-> MPPGCL Junior Engineer Notification 2025 has been released for various fields of post (Advt No. 3233).
-> MPPGCL has announced a total of 90 vacancies for Civil, Mechanical, Electrical, and Electronics Engineering (Junior Engineer).
-> Interested candidates can submit their online application form, from 23rd July to 21st August 2025.
-> MPPGCL Junior Engineer result PDF has been released at the offiical website.
-> The MPPGCL Junior Engineer Exam Date has been announced.
-> The MPPGCL Junior Engineer Notification was released for 284 vacancies.
-> The selection process includes a Computer Based Test and Document Verification.
-> Candidates can check the MPPGCL JE Previous Year Papers which helps to understand the difficulty level of the exam.