Question
Download Solution PDFIn the LT line distribution, if
This question was previously asked in
MPPGCL JE Electrical 28 April 2023 Shift 1 Official Paper
Answer (Detailed Solution Below)
Option 2 : 21
Free Tests
View all Free tests >
MPPGCL JE Electrical Full Test 1
100 Qs.
100 Marks
120 Mins
Detailed Solution
Download Solution PDFConcept
The number of poles required in an LT (Low Tension) line distribution system is:
Given,