  1. Material selection problems
  2. Product design problems
  3. Scheduling of production to meet sales forecast
  4. Quenching problems

Answer (Detailed Solution Below)

Option 1 : Material selection problems

Detailed Solution

Download Solution PDF

Explanation:

Linear programming (LP)

  • Linear programming (LP) in industrial engineering is used for the optimization of our limited resources when there is a number of alternate solutions possible for the problem like material selection.
  • The real-life problems can be written in the form of a linear equation by specifying the relation between its variables
  • Linear programming is used for obtaining the most optimal solution for a problem with given constraints.
  • Using linear programming requires defined variables and constraints, to find the largest objective function (maximization).
  • In some cases, linear programming is instead used for the smallest possible objective function value (minimization).
  • Linear programming requires the creation of inequalities and then graphing those to solve problems.
  • Some linear programming can be done manually.
  • When the variables and calculations become too complex and require the use of computational software.

Forecasting and Scheduling:

1. Forecasting:

  • The main purpose of forecasting is to estimate the occurrence, timing, or magnitude of future events.
  • Once, the reliable forecast for the demand is available, good planning of activities is needed to meet the future demand.
  • Forecasting thus provides input to the planning and scheduling process

2. Scheduling:

  • Scheduling involves fixing the priorities for different jobs and deciding the starting and finishing time of each job.
  • The main purpose of scheduling is to prepare a time-table indicating the time.
  • Scheduling is used to allocate resources over time to accomplish specific tasks.
  • It should take account of the technical requirement of the task, available capacity, and forecasted demand.
  • The output plan should be translated into operations, timing, and schedule on the shop floor.
  • Detailed scheduling encompasses the formation of the starting and finishing time of all jobs at each operational facility.
  • Gant Chart is used for scheduling after forecasting.
Latest BPSC Lecturer Updates

Last updated on May 9, 2025

-> The BPSC Lecturere DV will be held on 28th May 2025.

-> The written exam took place on 20th March 2025.

-> BPSC Lecturer notification was released for 6 vacancies.

-> The BPSC recruits eligible candidates for the post of Lecturer for various disciplines in Government Colleges across the state.

-> Candidates must attempt the BPSC Lecturer EC Mock Tests. Candidates can also download and practice from the BPSC Lecturer previous year papers

More Linear Programming Questions

More Operations Research Questions

Get Free Access Now
Hot Links: teen patti king teen patti all app teen patti joy apk teen patti gold download